  • Current streak for all 94 units
  • Qualifying runs and champions
  • Days since the last reactor trip
  • Completed run history per unit

Current Runs · ERCOT + 2 more

alphabetical · 18 units
#UnitMarketMW Streak and trip record Individual
· Browns Ferry 1 TVA 1,227 █████
· Browns Ferry 2 TVA 1,208 █████
· Browns Ferry 3 TVA 1,227 █████
· Catawba 1 Duke Carolinas 1,160 █████
· Catawba 2 Duke Carolinas 1,150 █████
· Comanche Peak 1 ERCOT 1,209 █████
· Comanche Peak 2 ERCOT 1,197 █████
· McGuire 1 Duke Carolinas 1,158 █████
· McGuire 2 Duke Carolinas 1,158 █████
· Oconee 1 Duke Carolinas 862 █████
· Oconee 2 Duke Carolinas 865 █████
· Oconee 3 Duke Carolinas 873 █████
· Sequoyah 1 TVA 1,148 █████
· Sequoyah 2 TVA 1,126 █████
· South Texas 1 ERCOT 1,300 █████
· South Texas 2 ERCOT 1,280 █████
· Watts Bar 1 TVA 1,123 █████
· Watts Bar 2 TVA 1,122 █████
Toward B2B is progress through a full fuel cycle: a run only qualifies once the unit has gone from one refueling outage to the next without an unplanned shutdown, so the threshold is set per unit rather than as one fleet-wide number. Days since trip spans refuelings and is the longer-horizon read.
A long streak is not the same as a firm date Pro · $499/mo

A unit can run clean for six hundred days and still hand back an outage two weeks late. The overrun projection is the number that says which.

  • Projected overrun days per unit
  • Scored against its own outage history