NukeGryd
Market Briefing · live

Markets

Where U.S. nuclear supply is tightest right now, and what is coming off line next. As of Aug 21, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Most-stressed Market
MISO
5.6% offline · 650 MW
MW in Refueling Now
617 MW
1 unit at a full outage
MW at Risk · Next 60 Days
paid · capacity at risk in 60 days
Biggest 30-day Mover
MISO
availability ▼ 5.3 pts

By Market

Available nuclear MW now, the day's move, vs 7-day and a year ago, and the 30-day trend, by balancing authority
ISO / RTO 31u
PJM
32,307 MW
98.8% available ↘ 197 MW DoD
vs 7d avg−157 MW (−0.5%)
vs 1 yr ago−171 MW (−0.5%)
Availability · 30d97.2% → 100.0%
What to watch Active: Calvert Cliffs 2 · −207 MW since Aug 21, 2026
ISO / RTO 13u
MISO
10,862 MW
94.4% available 0 MW DoD
vs 7d avg+28 MW (+0.3%)
vs 1 yr ago−459 MW (−4.1%)
Availability · 30d86.1% → 99.7%
What to watch Active: Monticello · −617 MW since Jul 23, 2026
Vertically Integrated 7u
TVA
8,181 MW
100.0% available 0 MW DoD
vs 7d avg+39 MW (+0.5%)
vs 1 yr ago0 MW (0.0%)
Availability · 30d96.7% → 100.0%
What to watch All units at full power
Vertically Integrated 8u
Southern (SOCO)
8,080 MW
100.0% available 0 MW DoD
vs 7d avg0 MW (0.0%)
vs 1 yr ago+45 MW (+0.6%)
Availability · 30d100.0% → 100.0%
What to watch All units at full power
Vertically Integrated 7u
Duke Carolinas (DUK)
7,191 MW
99.5% available 0 MW DoD
vs 7d avg−25 MW (−0.3%)
vs 1 yr ago−35 MW (−0.5%)
Availability · 30d99.5% → 100.0%
What to watch Active: McGuire 1 · −35 MW since Aug 19, 2026
ISO / RTO 4u
ERCOT
4,986 MW
100.0% available 0 MW DoD
vs 7d avg0 MW (0.0%)
vs 1 yr ago0 MW (0.0%)
Availability · 30d100.0% → 100.0%
What to watch All units at full power
Vertically Integrated 3u
Palo Verde / SRP
3,937 MW
100.0% available 0 MW DoD
vs 7d avg+6 MW (+0.1%)
vs 1 yr ago0 MW (0.0%)
Availability · 30d98.3% → 100.0%
What to watch All units at full power
Vertically Integrated 4u
Florida Power & Light (FPL)
3,649 MW
100.0% available 0 MW DoD
vs 7d avg+207 MW (+6.0%)
vs 1 yr ago−17 MW (−0.5%)
Availability · 30d73.1% → 100.0%
What to watch All units at full power
Vertically Integrated 4u
Duke Progress (CPLE)
3,593 MW
100.0% available 0 MW DoD
vs 7d avg0 MW (0.0%)
vs 1 yr ago0 MW (0.0%)
Availability · 30d86.6% → 100.0%
What to watch All units at full power
ISO / RTO 3u
ISO-NE
3,352 MW
100.0% available 0 MW DoD
vs 7d avg0 MW (0.0%)
vs 1 yr ago+52 MW (+1.6%)
Availability · 30d74.2% → 100.0%
What to watch All units at full power
ISO / RTO 4u
NYISO
3,241 MW
97.4% available 0 MW DoD
vs 7d avg−12 MW (−0.4%)
vs 1 yr ago−85 MW (−2.6%)
Availability · 30d97.4% → 100.0%
What to watch Active: FitzPatrick · −85 MW since Jul 28, 2026
ISO / RTO 2u
CAISO
2,240 MW
100.0% available 0 MW DoD
vs 7d avg0 MW (0.0%)
vs 1 yr ago0 MW (0.0%)
Availability · 30d100.0% → 100.0%
What to watch All units at full power
ISO / RTO 2u
SPP
1,902 MW
97.6% available ↘ 8 MW DoD
vs 7d avg−11 MW (−0.6%)
vs 1 yr ago−46 MW (−2.4%)
Availability · 30d88.1% → 100.0%
What to watch Active: Cooper · −46 MW since Aug 13, 2026
Vertically Integrated 1u
Bonneville (BPAT)
1,151 MW
100.0% available 0 MW DoD
vs 7d avg0 MW (0.0%)
vs 1 yr ago0 MW (0.0%)
Availability · 30d100.0% → 100.0%
What to watch All units at full power
Vertically Integrated 1u
Dominion SC (SCEG)
977 MW
100.0% available 0 MW DoD
vs 7d avg0 MW (0.0%)
vs 1 yr ago+68 MW (+7.5%)
Availability · 30d100.0% → 100.0%
What to watch All units at full power
Available MW = nuclear generating MW now (installed nuclear MW minus what is offline), at the 98% full-power floor. DoD is the change since yesterday; the 30-day spark is the market's availability (% of its nuclear fleet generating). "What to watch" is the largest unit offline now, with the date it went down.

Biggest 30-Day Movers

Signed change in nuclear availability over the last 30 days
MISO
↘ −5.3 pp
Florida Power & Light (FPL)
↗ +3.9 pp
NYISO
↘ −2.6 pp
SPP
↘ −2.4 pp
PJM
↘ −1.2 pp
Duke Carolinas (DUK)
↘ −0.5 pp
TVA
↗ +0.0 pp
Southern (SOCO)
↗ +0.0 pp
ERCOT
↗ +0.0 pp
Palo Verde / SRP
↗ +0.0 pp
Duke Progress (CPLE)
↗ +0.0 pp
ISO-NE
↗ +0.0 pp
CAISO
↗ +0.0 pp
Bonneville (BPAT)
↗ +0.0 pp
Dominion SC (SCEG)
↗ +0.0 pp
Change in each market's nuclear availability (generating MW as a share of installed nuclear MW) between 30 days ago and today. Positive points = more nuclear back online.

Most-stressed Markets

By share of nuclear fleet offline, lowest availability first
MarketTypeUnits Availability MW Offline % Offline Grid tomorrow 30d Δavail
MISO ISO/RTO 13 94.4% 650 5.6% soft ▼ 5.3
NYISO ISO/RTO 4 97.4% 85 2.6% soft ▼ 2.6
SPP ISO/RTO 2 97.6% 46 2.4% tight ▼ 2.4
PJM ISO/RTO 31 98.8% 385 1.2% soft ▼ 1.2
Duke Carolinas (DUK) Non-ISO 7 99.5% 35 0.5% ▼ 0.5
TVA Non-ISO 7 99.8% 0.0% ▲ 0.0
Duke Progress (CPLE) Non-ISO 4 100.0% 0.0% ▲ 0.0
Bonneville (BPAT) Non-ISO 1 100.0% 0.0% ▲ 0.0
ERCOT ISO/RTO 4 100.0% 0.0% normal ▲ 0.0
CAISO ISO/RTO 2 100.0% 0.0% soft ▲ 0.0
Southern (SOCO) Non-ISO 8 99.7% 0.0% ▲ 0.0
ISO-NE ISO/RTO 3 100.0% 0.0% soft ▲ 0.0
Palo Verde / SRP Non-ISO 3 100.0% 0.0% ▲ 0.0
Florida Power & Light (FPL) Non-ISO 4 100.0% 0.0% ▲ 3.9
Dominion SC (SCEG) Non-ISO 1 100.0% 0.0% ▲ 0.0
Availability = nuclear generating MW ÷ installed nuclear MW. "Grid tomorrow" is the day-ahead demand forecast vs the trailing-30-day norm, where a nuclear loss bites hardest. 30d Δavail is the change in the market's nuclear availability over the last 30 days.

The upcoming outage pipeline is a paid feature

Which units come off line next, when, and how much capacity is at risk by market (utility-published dates plus model projections) is part of NukeGryd Individual and up. Today's live market stress stays free.

See plans