Florida Power & Light (FPL), 4 operating reactors, 3,649 MW installed. Every unit below links to its own operating record.

FPL Today

as of Sep 14, 2026
MW off line
0
0.0% of the market's nuclear fleet
Generating now
3,649
of 3,649 MW installed
Units at power
4 / 4
0 derated · 0 off line
Fleet reliability
███

The Generators in FPL

4 units · click any unit for its full record
UnitOwnerStMWPower MW offStatus RecordIndividual Overrun B2B
Saint Lucie 2 NextEra Energy FL 987 100.0% At power ██ ██ ██
Saint Lucie 1 NextEra Energy FL 981 100.0% At power ██ ██ ██
Turkey Point 4 NextEra Energy FL 844 100.0% At power ██ ██ ██
Turkey Point 3 NextEra Energy FL 837 100.0% At power ██ ██ ██
Know which of these units you can rely on Individual · $165/mo

Every reactor scored 0-100 on capacity factor, forced-outage days, streak length, refuel and startup speed, so a published date from a top-decile unit is read differently from one from a bottom-decile unit.

  • Operational Excellence per unit
  • Projected overrun days
  • Breaker-to-breaker streaks
  • Rank within reactor type and cycle length

FPL Outage Pipeline

Individual

When every unit in FPL comes off line next, on one timeline, with the utility's published dates and our projected ones side by side.

See FPL's outage pipeline Individual · $165/mo

The next eighteen months of outages for this market on a single chart, so overlapping refuelings are obvious before they bite.

  • Published + projected start dates
  • MW at stake per outage
  • Confidence on every date
  • Projected overrun days

FPL Fleet Operating Record

Individual

How the 4 reactors in FPL actually run, as a fleet: the average Operational Excellence score, forced-outage days per unit, how many are in a qualifying breaker-to-breaker run, and which unit in this market is the most and least reliable.

FPL This Season

Full seasonal comparison
Fall 2026 average
40 MW
season in progress
Season peak
981 MW
on Aug 14
vs Fall 2025
███
Refuels this season
0
1 unplanned events
Stack FPL against every other market Pro · $499/mo

Eighteen months of MW offline, broken out by market and stacked, so you can see whose supply moved and when.

  • Stacked MW-offline history by market
  • Per-market forward curve
  • Ontario as a parallel fleet
  • CSV of any board