Bonneville Power Administration (BPAT), 1 operating reactors, 1,151 MW installed. Every unit below links to its own operating record.

BPA Today

as of Sep 14, 2026
MW off line
0
0.0% of the market's nuclear fleet
Generating now
1,151
of 1,151 MW installed
Units at power
1 / 1
0 derated · 0 off line
Fleet reliability
███

The Generators in BPA

1 units · click any unit for its full record
UnitOwnerStMWPower MW offStatus RecordIndividual Overrun B2B
Columbia Generating Station Energy Northwest WA 1,151 100.0% At power ██ ██ ██
Know which of these units you can rely on Individual · $165/mo

Every reactor scored 0-100 on capacity factor, forced-outage days, streak length, refuel and startup speed, so a published date from a top-decile unit is read differently from one from a bottom-decile unit.

  • Operational Excellence per unit
  • Projected overrun days
  • Breaker-to-breaker streaks
  • Rank within reactor type and cycle length

BPA Outage Pipeline

Individual

When every unit in BPA comes off line next, on one timeline, with the utility's published dates and our projected ones side by side.

See BPA's outage pipeline Individual · $165/mo

The next eighteen months of outages for this market on a single chart, so overlapping refuelings are obvious before they bite.

  • Published + projected start dates
  • MW at stake per outage
  • Confidence on every date
  • Projected overrun days

BPA Fleet Operating Record

Individual

How the 1 reactors in BPA actually run, as a fleet: the average Operational Excellence score, forced-outage days per unit, how many are in a qualifying breaker-to-breaker run, and which unit in this market is the most and least reliable.

BPA This Season

Full seasonal comparison
Fall 2026 average
0 MW
season in progress
Season peak
0 MW
on Jul 1
vs Fall 2025
███
Refuels this season
0
0 unplanned events
Stack BPA against every other market Pro · $499/mo

Eighteen months of MW offline, broken out by market and stacked, so you can see whose supply moved and when.

  • Stacked MW-offline history by market
  • Per-market forward curve
  • Ontario as a parallel fleet
  • CSV of any board