NukeGryd
The Operating Record

Breaker-to-Breaker Registry

A breaker-to-breaker run is one refueling outage to the next with no unplanned shutdown in between. It is the cleanest single read on whether a reactor is well run.
Filtered to TVA SPP Dominion SC Southern Show all markets
Who is running clean, and for how long Individual · $165/mo

Continuous days on line for every reactor, which ones are inside a qualifying breaker-to-breaker run right now, how many they have completed, and how long since each one last tripped.

  • Current streak for all 94 units
  • Qualifying runs and champions
  • Days since the last reactor trip
  • Completed run history per unit

Current Runs · TVA + 3 more

alphabetical · 18 units
#UnitMarketMW Streak and trip record Individual
· Browns Ferry 1 TVA 1,227 █████
· Browns Ferry 2 TVA 1,208 █████
· Browns Ferry 3 TVA 1,227 █████
· Cooper SPP 772 █████
· Farley 1 Southern 895 █████
· Farley 2 Southern 896 █████
· Hatch 1 Southern 876 █████
· Hatch 2 Southern 883 █████
· Sequoyah 1 TVA 1,148 █████
· Sequoyah 2 TVA 1,126 █████
· Summer Dominion SC 977 █████
· Vogtle 1 Southern 1,150 █████
· Vogtle 2 Southern 1,152 █████
· Vogtle 3 Southern 1,114 █████
· Vogtle 4 Southern 1,114 █████
· Watts Bar 1 TVA 1,123 █████
· Watts Bar 2 TVA 1,122 █████
· Wolf Creek 1 SPP 1,177 █████
Toward B2B is progress through a full fuel cycle: a run only qualifies once the unit has gone from one refueling outage to the next without an unplanned shutdown, so the threshold is set per unit rather than as one fleet-wide number. Days since trip spans refuelings and is the longer-horizon read.
A long streak is not the same as a firm date Pro · $499/mo

A unit can run clean for six hundred days and still hand back an outage two weeks late. The overrun projection is the number that says which.

  • Projected overrun days per unit
  • Scored against its own outage history
  • MW-days the market has not priced