The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 16, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
12,901 MW
87.3% of 14,772 MW installed
Fleet Availability
87.3%
nuclear generating ÷ installed
Units in Outage
1
at a full outage (0% power)
Units Derated
3
running below 98% power
Region II
Southeast
Atlanta, GA
85.0%
availability
9,925 MW
online of 11,673
1,748 MW
offline
12 units:
9 at power
2 derated 1 in outage
Top markets
Southern 8,080 MW
Duke Progress 3,593 MW
Region IV
West / South-Central
Arlington, TX
96.0%
availability
2,976 MW
online of 3,099
123 MW
offline
3 units:
2 at power
1 derated
Top markets
SPP 1,948 MW
BPA 1,151 MW
Region Summary
| Region | Coverage | Units | Capacity | Online | Availability | MW Offline | Offline / Derated | Top markets |
|---|---|---|---|---|---|---|---|---|
| Region II | Southeast | 12 | 11,673 | 9,925 | 85.0% | 1,748 | 1 / 2 | SouthernDuke Progress |
| Region IV | West / South-Central | 3 | 3,099 | 2,976 | 96.0% | 123 | 0 / 1 | SPPBPA |
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.
Fleet by Region
Every reporting unit, grouped by region, biggest supply loss first| Unit | Market | State | Power | Capacity | MW offline | Status |
|---|---|---|---|---|---|---|
| Region II · Southeast (12 units, 9,925 MW online) | ||||||
| Vogtle 2 | Southern | GA | 0.0% | 1,152 | 1,152 | Outage |
| Vogtle 3 | Southern | GA | 60.0% | 1,114 | 446 | Derated |
| Hatch 2 | Southern | GA | 83.0% | 883 | 150 | Derated |
| Vogtle 1 | Southern | GA | 100.0% | 1,150 | — | At power |
| Vogtle 4 | Southern | GA | 100.0% | 1,114 | — | At power |
| Harris 1 | Duke Progress | NC | 100.0% | 964 | — | At power |
| Brunswick 1 | Duke Progress | NC | 100.0% | 938 | — | At power |
| Brunswick 2 | Duke Progress | NC | 100.0% | 932 | — | At power |
| Farley 2 | Southern | AL | 100.0% | 896 | — | At power |
| Farley 1 | Southern | AL | 100.0% | 895 | — | At power |
| Hatch 1 | Southern | GA | 100.0% | 876 | — | At power |
| Robinson 2 | Duke Progress | SC | 100.0% | 759 | — | At power |
| Region IV · West / South-Central (3 units, 2,976 MW online) | ||||||
| Cooper | SPP | NE | 84.0% | 772 | 123 | Derated |
| Wolf Creek 1 | SPP | KS | 100.0% | 1,177 | — | At power |
| Columbia Generating Station | BPA | WA | 100.0% | 1,151 | — | At power |
Ontario (IESO) separate fleet
Ontario detailMW Offline
3,640 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,520 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet
Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.