NukeGryd
Fleet by NRC Region · updated daily

Regions

The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 15, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
6,787 MW
98.9% of 6,866 MW installed
Fleet Availability
98.9%
nuclear generating ÷ installed
Units in Outage
0
at a full outage (0% power)
Units Derated
1
running below 98% power
Region II

Southeast

Atlanta, GA
98.3%
availability
4,547 MW
online of 4,626
79 MW
offline
5 units: 4 at power 1 derated
Top markets
FPL 3,649 MW Dominion SC 977 MW
Region IV

West / South-Central

Arlington, TX
100.0%
availability
2,240 MW
online of 2,240
0 MW
offline
2 units: 2 at power
Top markets
CAISO 2,240 MW

Region Summary

RegionCoverageUnitsCapacity OnlineAvailability MW OfflineOffline / DeratedTop markets
Region II Southeast 5 4,626 4,547 98.3% 79 0 / 1 FPLDominion SC
Region IV West / South-Central 2 2,240 2,240 100.0% 0 / 0 CAISO
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.

Fleet by Region

Every reporting unit, grouped by region, biggest supply loss first
UnitMarketStatePowerCapacityMW offlineStatus
Region II · Southeast (5 units, 4,547 MW online)
Saint Lucie 2 FPL FL 92.0% 987 79 Derated
Saint Lucie 1 FPL FL 100.0% 981 At power
Summer Dominion SC SC 100.0% 977 At power
Turkey Point 4 FPL FL 100.0% 844 At power
Turkey Point 3 FPL FL 100.0% 837 At power
Region IV · West / South-Central (2 units, 2,240 MW online)
Diablo Canyon 1 CAISO CA 100.0% 1,122 At power
Diablo Canyon 2 CAISO CA 100.0% 1,118 At power

Ontario (IESO) separate fleet

Ontario detail
MW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet

Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.