NukeGryd
Fleet by NRC Region · updated daily

Regions

The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 16, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
14,839 MW
89.5% of 16,587 MW installed
Fleet Availability
89.5%
nuclear generating ÷ installed
Units in Outage
1
at a full outage (0% power)
Units Derated
2
running below 98% power
Region II

Southeast

Atlanta, GA
86.2%
availability
10,902 MW
online of 12,650
1,748 MW
offline
13 units: 10 at power 2 derated 1 in outage
Top markets
Southern 8,080 MW Duke Progress 3,593 MW Dominion SC 977 MW
Region IV

West / South-Central

Arlington, TX
100.0%
availability
3,937 MW
online of 3,937
0 MW
offline
3 units: 3 at power
Top markets
SRP 3,937 MW

Region Summary

RegionCoverageUnitsCapacity OnlineAvailability MW OfflineOffline / DeratedTop markets
Region II Southeast 13 12,650 10,902 86.2% 1,748 1 / 2 SouthernDuke ProgressDominion SC
Region IV West / South-Central 3 3,937 3,937 100.0% 0 / 0 SRP
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.

Fleet by Region

Every reporting unit, grouped by region, biggest supply loss first
UnitMarketStatePowerCapacityMW offlineStatus
Region II · Southeast (13 units, 10,902 MW online)
Vogtle 2 Southern GA 0.0% 1,152 1,152 Outage
Vogtle 3 Southern GA 60.0% 1,114 446 Derated
Hatch 2 Southern GA 83.0% 883 150 Derated
Vogtle 1 Southern GA 100.0% 1,150 At power
Vogtle 4 Southern GA 100.0% 1,114 At power
Summer Dominion SC SC 100.0% 977 At power
Harris 1 Duke Progress NC 100.0% 964 At power
Brunswick 1 Duke Progress NC 100.0% 938 At power
Brunswick 2 Duke Progress NC 100.0% 932 At power
Farley 2 Southern AL 100.0% 896 At power
Farley 1 Southern AL 100.0% 895 At power
Hatch 1 Southern GA 100.0% 876 At power
Robinson 2 Duke Progress SC 100.0% 759 At power
Region IV · West / South-Central (3 units, 3,937 MW online)
Palo Verde 2 SRP AZ 100.0% 1,314 At power
Palo Verde 3 SRP AZ 100.0% 1,312 At power
Palo Verde 1 SRP AZ 100.0% 1,311 At power