Fleet by NRC Region · updated daily
Regions
The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 15, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
13,733 MW
91.5% of 15,007 MW installed
Fleet Availability
91.5%
nuclear generating ÷ installed
Units in Outage
1
at a full outage (0% power)
Units Derated
1
running below 98% power
Region II
Southeast
Atlanta, GA
89.3%
availability
9,661 MW
online of 10,819
1,158 MW
offline
11 units:
10 at power
1 in outage
Top markets
Duke Carolinas 7,226 MW
Duke Progress 3,593 MW
Region IV
West / South-Central
Arlington, TX
97.2%
availability
4,072 MW
online of 4,188
116 MW
offline
4 units:
3 at power
1 derated
Top markets
CAISO 2,240 MW
SPP 1,948 MW
Region Summary
| Region | Coverage | Units | Capacity | Online | Availability | MW Offline | Offline / Derated | Top markets |
|---|---|---|---|---|---|---|---|---|
| Region II | Southeast | 11 | 10,819 | 9,661 | 89.3% | 1,158 | 1 / 0 | Duke CarolinasDuke Progress |
| Region IV | West / South-Central | 4 | 4,188 | 4,072 | 97.2% | 116 | 0 / 1 | CAISOSPP |
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.
Fleet by Region
Every reporting unit, grouped by region, biggest supply loss first| Unit | Market | State | Power | Capacity | MW offline | Status |
|---|---|---|---|---|---|---|
| Region II · Southeast (11 units, 9,661 MW online) | ||||||
| McGuire 1 | Duke Carolinas | NC | 0.0% | 1,158 | 1,158 | Outage |
| Catawba 1 | Duke Carolinas | SC | 100.0% | 1,160 | — | At power |
| McGuire 2 | Duke Carolinas | NC | 100.0% | 1,158 | — | At power |
| Catawba 2 | Duke Carolinas | SC | 100.0% | 1,150 | — | At power |
| Harris 1 | Duke Progress | NC | 100.0% | 964 | — | At power |
| Brunswick 1 | Duke Progress | NC | 100.0% | 938 | — | At power |
| Brunswick 2 | Duke Progress | NC | 100.0% | 932 | — | At power |
| Oconee 3 | Duke Carolinas | SC | 100.0% | 873 | — | At power |
| Oconee 2 | Duke Carolinas | SC | 100.0% | 865 | — | At power |
| Oconee 1 | Duke Carolinas | SC | 100.0% | 862 | — | At power |
| Robinson 2 | Duke Progress | SC | 100.0% | 759 | — | At power |
| Region IV · West / South-Central (4 units, 4,072 MW online) | ||||||
| Cooper | SPP | NE | 85.0% | 772 | 116 | Derated |
| Wolf Creek 1 | SPP | KS | 100.0% | 1,177 | — | At power |
| Diablo Canyon 1 | CAISO | CA | 100.0% | 1,122 | — | At power |
| Diablo Canyon 2 | CAISO | CA | 100.0% | 1,118 | — | At power |
Ontario (IESO) separate fleet
Ontario detailMW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet
Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.