Fleet by NRC Region · updated daily
Regions
The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 17, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
22,134 MW
94.6% of 23,391 MW installed
Fleet Availability
94.6%
nuclear generating ÷ installed
Units in Outage
1
at a full outage (0% power)
Units Derated
1
running below 98% power
Region II
Southeast
Atlanta, GA
91.3%
availability
13,211 MW
online of 14,468
1,257 MW
offline
15 units:
13 at power
1 derated 1 in outage
Top markets
Duke Carolinas 7,226 MW
FPL 3,649 MW
Duke Progress 3,593 MW
Region IV
West / South-Central
Arlington, TX
100.0%
availability
8,923 MW
online of 8,923
0 MW
offline
7 units:
7 at power
Top markets
ERCOT 4,986 MW
SRP 3,937 MW
Region Summary
| Region | Coverage | Units | Capacity | Online | Availability | MW Offline | Offline / Derated | Top markets |
|---|---|---|---|---|---|---|---|---|
| Region II | Southeast | 15 | 14,468 | 13,211 | 91.3% | 1,257 | 1 / 1 | Duke CarolinasFPLDuke Progress |
| Region IV | West / South-Central | 7 | 8,923 | 8,923 | 100.0% | — | 0 / 0 | ERCOTSRP |
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.
Fleet by Region
Every reporting unit, grouped by region, biggest supply loss first| Unit | Market | State | Power | Capacity | MW offline | Status |
|---|---|---|---|---|---|---|
| Region II · Southeast (15 units, 13,211 MW online) | ||||||
| McGuire 1 | Duke Carolinas | NC | 0.0% | 1,158 | 1,158 | Outage |
| Saint Lucie 2 | FPL | FL | 90.0% | 987 | 99 | Derated |
| Catawba 1 | Duke Carolinas | SC | 100.0% | 1,160 | — | At power |
| McGuire 2 | Duke Carolinas | NC | 100.0% | 1,158 | — | At power |
| Catawba 2 | Duke Carolinas | SC | 100.0% | 1,150 | — | At power |
| Saint Lucie 1 | FPL | FL | 100.0% | 981 | — | At power |
| Harris 1 | Duke Progress | NC | 100.0% | 964 | — | At power |
| Brunswick 1 | Duke Progress | NC | 100.0% | 938 | — | At power |
| Brunswick 2 | Duke Progress | NC | 100.0% | 932 | — | At power |
| Oconee 3 | Duke Carolinas | SC | 100.0% | 873 | — | At power |
| Oconee 2 | Duke Carolinas | SC | 100.0% | 865 | — | At power |
| Oconee 1 | Duke Carolinas | SC | 100.0% | 862 | — | At power |
| Turkey Point 4 | FPL | FL | 100.0% | 844 | — | At power |
| Turkey Point 3 | FPL | FL | 100.0% | 837 | — | At power |
| Robinson 2 | Duke Progress | SC | 100.0% | 759 | — | At power |
| Region IV · West / South-Central (7 units, 8,923 MW online) | ||||||
| Palo Verde 2 | SRP | AZ | 100.0% | 1,314 | — | At power |
| Palo Verde 3 | SRP | AZ | 100.0% | 1,312 | — | At power |
| Palo Verde 1 | SRP | AZ | 100.0% | 1,311 | — | At power |
| South Texas 1 | ERCOT | TX | 100.0% | 1,300 | — | At power |
| South Texas 2 | ERCOT | TX | 100.0% | 1,280 | — | At power |
| Comanche Peak 1 | ERCOT | TX | 100.0% | 1,209 | — | At power |
| Comanche Peak 2 | ERCOT | TX | 100.0% | 1,197 | — | At power |