Fleet by NRC Region · updated daily
Regions
The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 15, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
11,666 MW
99.3% of 11,745 MW installed
Fleet Availability
99.3%
nuclear generating ÷ installed
Units in Outage
0
at a full outage (0% power)
Units Derated
1
running below 98% power
Region I
Northeast
King of Prussia, PA
100.0%
availability
3,352 MW
online of 3,352
0 MW
offline
3 units:
3 at power
Top markets
ISO-NE 3,352 MW
Region II
Southeast
Atlanta, GA
98.9%
availability
7,163 MW
online of 7,242
79 MW
offline
8 units:
7 at power
1 derated
Top markets
FPL 3,649 MW
Duke Progress 3,593 MW
Region IV
West / South-Central
Arlington, TX
100.0%
availability
1,151 MW
online of 1,151
0 MW
offline
1 units:
1 at power
Top markets
BPA 1,151 MW
Region Summary
| Region | Coverage | Units | Capacity | Online | Availability | MW Offline | Offline / Derated | Top markets |
|---|---|---|---|---|---|---|---|---|
| Region I | Northeast | 3 | 3,352 | 3,352 | 100.0% | — | 0 / 0 | ISO-NE |
| Region II | Southeast | 8 | 7,242 | 7,163 | 98.9% | 79 | 0 / 1 | FPLDuke Progress |
| Region IV | West / South-Central | 1 | 1,151 | 1,151 | 100.0% | — | 0 / 0 | BPA |
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.
Fleet by Region
Every reporting unit, grouped by region, biggest supply loss first| Unit | Market | State | Power | Capacity | MW offline | Status |
|---|---|---|---|---|---|---|
| Region I · Northeast (3 units, 3,352 MW online) | ||||||
| Seabrook 1 | ISO-NE | NH | 100.0% | 1,246 | — | At power |
| Millstone 3 | ISO-NE | CT | 100.0% | 1,243 | — | At power |
| Millstone 2 | ISO-NE | CT | 100.0% | 863 | — | At power |
| Region II · Southeast (8 units, 7,163 MW online) | ||||||
| Saint Lucie 2 | FPL | FL | 92.0% | 987 | 79 | Derated |
| Saint Lucie 1 | FPL | FL | 100.0% | 981 | — | At power |
| Harris 1 | Duke Progress | NC | 100.0% | 964 | — | At power |
| Brunswick 1 | Duke Progress | NC | 100.0% | 938 | — | At power |
| Brunswick 2 | Duke Progress | NC | 100.0% | 932 | — | At power |
| Turkey Point 4 | FPL | FL | 100.0% | 844 | — | At power |
| Turkey Point 3 | FPL | FL | 100.0% | 837 | — | At power |
| Robinson 2 | Duke Progress | SC | 100.0% | 759 | — | At power |
| Region IV · West / South-Central (1 units, 1,151 MW online) | ||||||
| Columbia Generating Station | BPA | WA | 100.0% | 1,151 | — | At power |
Ontario (IESO) separate fleet
Ontario detailMW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet
Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.