Fleet by NRC Region · updated daily
Regions
The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 15, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
21,288 MW
94.9% of 22,427 MW installed
Fleet Availability
94.9%
nuclear generating ÷ installed
Units in Outage
1
at a full outage (0% power)
Units Derated
3
running below 98% power
Region I
Northeast
King of Prussia, PA
74.6%
availability
2,485 MW
online of 3,329
844 MW
offline
4 units:
3 at power
1 in outage
Top markets
NYISO 3,329 MW
Region II
Southeast
Atlanta, GA
98.4%
availability
4,967 MW
online of 5,046
79 MW
offline
5 units:
4 at power
1 derated
Top markets
FPL 3,649 MW
MISO 1,397 MW
Region III
Midwest
Lisle, IL
97.1%
availability
6,070 MW
online of 6,253
183 MW
offline
8 units:
7 at power
1 derated
Top markets
MISO 6,253 MW
Region IV
West / South-Central
Arlington, TX
99.6%
availability
7,767 MW
online of 7,799
33 MW
offline
7 units:
6 at power
1 derated
Top markets
SRP 3,937 MW
MISO 3,862 MW
Region Summary
| Region | Coverage | Units | Capacity | Online | Availability | MW Offline | Offline / Derated | Top markets |
|---|---|---|---|---|---|---|---|---|
| Region I | Northeast | 4 | 3,329 | 2,485 | 74.6% | 844 | 1 / 0 | NYISO |
| Region II | Southeast | 5 | 5,046 | 4,967 | 98.4% | 79 | 0 / 1 | FPLMISO |
| Region III | Midwest | 8 | 6,253 | 6,070 | 97.1% | 183 | 0 / 1 | MISO |
| Region IV | West / South-Central | 7 | 7,799 | 7,767 | 99.6% | 33 | 0 / 1 | SRPMISO |
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.
Fleet by Region
Every reporting unit, grouped by region, biggest supply loss first| Unit | Market | State | Power | Capacity | MW offline | Status |
|---|---|---|---|---|---|---|
| Region I · Northeast (4 units, 2,485 MW online) | ||||||
| FitzPatrick | NYISO | NY | 0.0% | 844 | 844 | Outage |
| Nine Mile Point 2 | NYISO | NY | 100.0% | 1,283 | — | At power |
| Nine Mile Point 1 | NYISO | NY | 100.0% | 621 | — | At power |
| Ginna | NYISO | NY | 100.0% | 581 | — | At power |
| Region II · Southeast (5 units, 4,967 MW online) | ||||||
| Saint Lucie 2 | FPL | FL | 92.0% | 987 | 79 | Derated |
| Grand Gulf 1 | MISO | MS | 100.0% | 1,397 | — | At power |
| Saint Lucie 1 | FPL | FL | 100.0% | 981 | — | At power |
| Turkey Point 4 | FPL | FL | 100.0% | 844 | — | At power |
| Turkey Point 3 | FPL | FL | 100.0% | 837 | — | At power |
| Region III · Midwest (8 units, 6,070 MW online) | ||||||
| Clinton | MISO | IL | 83.0% | 1,079 | 183 | Derated |
| Callaway | MISO | MO | 100.0% | 1,190 | — | At power |
| Fermi 2 | MISO | MI | 100.0% | 1,141 | — | At power |
| Monticello | MISO | MN | 100.0% | 617 | — | At power |
| Point Beach 2 | MISO | WI | 100.0% | 597 | — | At power |
| Point Beach 1 | MISO | WI | 100.0% | 589 | — | At power |
| Prairie Island 1 | MISO | MN | 100.0% | 521 | — | At power |
| Prairie Island 2 | MISO | MN | 100.0% | 519 | — | At power |
| Region IV · West / South-Central (7 units, 7,767 MW online) | ||||||
| Waterford 3 | MISO | LA | 97.0% | 1,087 | 33 | Derated |
| Palo Verde 2 | SRP | AZ | 100.0% | 1,314 | — | At power |
| Palo Verde 3 | SRP | AZ | 100.0% | 1,312 | — | At power |
| Palo Verde 1 | SRP | AZ | 100.0% | 1,311 | — | At power |
| Arkansas Nuclear 2 | MISO | AR | 100.0% | 982 | — | At power |
| River Bend 1 | MISO | LA | 100.0% | 968 | — | At power |
| Arkansas Nuclear 1 | MISO | AR | 100.0% | 826 | — | At power |
Ontario (IESO) separate fleet
Ontario detailMW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet
Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.