Fleet by NRC Region · updated daily
Regions
The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 15, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
24,765 MW
94.2% of 26,284 MW installed
Fleet Availability
94.2%
nuclear generating ÷ installed
Units in Outage
1
at a full outage (0% power)
Units Derated
4
running below 98% power
Region II
Southeast
Atlanta, GA
90.9%
availability
11,882 MW
online of 13,070
1,187 MW
offline
13 units:
11 at power
1 derated 1 in outage
Top markets
Southern 8,080 MW
Duke Progress 3,593 MW
MISO 1,397 MW
Region III
Midwest
Lisle, IL
97.1%
availability
6,070 MW
online of 6,253
183 MW
offline
8 units:
7 at power
1 derated
Top markets
MISO 6,253 MW
Region IV
West / South-Central
Arlington, TX
97.9%
availability
6,813 MW
online of 6,961
148 MW
offline
7 units:
5 at power
2 derated
Top markets
MISO 3,862 MW
SPP 1,948 MW
BPA 1,151 MW
Region Summary
| Region | Coverage | Units | Capacity | Online | Availability | MW Offline | Offline / Derated | Top markets |
|---|---|---|---|---|---|---|---|---|
| Region II | Southeast | 13 | 13,070 | 11,882 | 90.9% | 1,187 | 1 / 1 | SouthernDuke ProgressMISO |
| Region III | Midwest | 8 | 6,253 | 6,070 | 97.1% | 183 | 0 / 1 | MISO |
| Region IV | West / South-Central | 7 | 6,961 | 6,813 | 97.9% | 148 | 0 / 2 | MISOSPPBPA |
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.
Fleet by Region
Every reporting unit, grouped by region, biggest supply loss first| Unit | Market | State | Power | Capacity | MW offline | Status |
|---|---|---|---|---|---|---|
| Region II · Southeast (13 units, 11,882 MW online) | ||||||
| Vogtle 2 | Southern | GA | 0.0% | 1,152 | 1,152 | Outage |
| Hatch 2 | Southern | GA | 96.0% | 883 | 35 | Derated |
| Grand Gulf 1 | MISO | MS | 100.0% | 1,397 | — | At power |
| Vogtle 1 | Southern | GA | 100.0% | 1,150 | — | At power |
| Vogtle 3 | Southern | GA | 100.0% | 1,114 | — | At power |
| Vogtle 4 | Southern | GA | 100.0% | 1,114 | — | At power |
| Harris 1 | Duke Progress | NC | 100.0% | 964 | — | At power |
| Brunswick 1 | Duke Progress | NC | 100.0% | 938 | — | At power |
| Brunswick 2 | Duke Progress | NC | 100.0% | 932 | — | At power |
| Farley 2 | Southern | AL | 100.0% | 896 | — | At power |
| Farley 1 | Southern | AL | 100.0% | 895 | — | At power |
| Hatch 1 | Southern | GA | 100.0% | 876 | — | At power |
| Robinson 2 | Duke Progress | SC | 100.0% | 759 | — | At power |
| Region III · Midwest (8 units, 6,070 MW online) | ||||||
| Clinton | MISO | IL | 83.0% | 1,079 | 183 | Derated |
| Callaway | MISO | MO | 100.0% | 1,190 | — | At power |
| Fermi 2 | MISO | MI | 100.0% | 1,141 | — | At power |
| Monticello | MISO | MN | 100.0% | 617 | — | At power |
| Point Beach 2 | MISO | WI | 100.0% | 597 | — | At power |
| Point Beach 1 | MISO | WI | 100.0% | 589 | — | At power |
| Prairie Island 1 | MISO | MN | 100.0% | 521 | — | At power |
| Prairie Island 2 | MISO | MN | 100.0% | 519 | — | At power |
| Region IV · West / South-Central (7 units, 6,813 MW online) | ||||||
| Cooper | SPP | NE | 85.0% | 772 | 116 | Derated |
| Waterford 3 | MISO | LA | 97.0% | 1,087 | 33 | Derated |
| Wolf Creek 1 | SPP | KS | 100.0% | 1,177 | — | At power |
| Columbia Generating Station | BPA | WA | 100.0% | 1,151 | — | At power |
| Arkansas Nuclear 2 | MISO | AR | 100.0% | 982 | — | At power |
| River Bend 1 | MISO | LA | 100.0% | 968 | — | At power |
| Arkansas Nuclear 1 | MISO | AR | 100.0% | 826 | — | At power |
Ontario (IESO) separate fleet
Ontario detailMW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet
Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.