Fleet by NRC Region · updated daily
Regions
The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 15, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
50,022 MW
95.6% of 52,329 MW installed
Fleet Availability
95.6%
nuclear generating ÷ installed
Units in Outage
2
at a full outage (0% power)
Units Derated
5
running below 98% power
Region I
Northeast
King of Prussia, PA
100.0%
availability
14,298 MW
online of 14,298
0 MW
offline
13 units:
13 at power
Top markets
PJM 14,298 MW
Region II
Southeast
Atlanta, GA
81.0%
availability
4,021 MW
online of 4,964
943 MW
offline
5 units:
4 at power
1 in outage
Top markets
PJM 3,567 MW
MISO 1,397 MW
Region III
Midwest
Lisle, IL
94.4%
availability
19,900 MW
online of 21,079
1,180 MW
offline
22 units:
18 at power
3 derated 1 in outage
Top markets
PJM 14,826 MW
MISO 6,253 MW
Region IV
West / South-Central
Arlington, TX
98.8%
availability
11,839 MW
online of 11,987
148 MW
offline
11 units:
9 at power
2 derated
Top markets
SRP 3,937 MW
MISO 3,862 MW
CAISO 2,240 MW
Region Summary
| Region | Coverage | Units | Capacity | Online | Availability | MW Offline | Offline / Derated | Top markets |
|---|---|---|---|---|---|---|---|---|
| Region I | Northeast | 13 | 14,298 | 14,298 | 100.0% | — | 0 / 0 | PJM |
| Region II | Southeast | 5 | 4,964 | 4,021 | 81.0% | 943 | 1 / 0 | PJMMISO |
| Region III | Midwest | 22 | 21,079 | 19,900 | 94.4% | 1,180 | 1 / 3 | PJMMISO |
| Region IV | West / South-Central | 11 | 11,987 | 11,839 | 98.8% | 148 | 0 / 2 | SRPMISOCAISO |
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.
Fleet by Region
Every reporting unit, grouped by region, biggest supply loss first| Unit | Market | State | Power | Capacity | MW offline | Status |
|---|---|---|---|---|---|---|
| Region I · Northeast (13 units, 14,298 MW online) | ||||||
| Peach Bottom 3 | PJM | PA | 100.0% | 1,285 | — | At power |
| Peach Bottom 2 | PJM | PA | 99.0% | 1,265 | — | At power |
| Susquehanna 1 | PJM | PA | 100.0% | 1,247 | — | At power |
| Susquehanna 2 | PJM | PA | 100.0% | 1,247 | — | At power |
| Hope Creek 1 | PJM | NJ | 98.0% | 1,172 | — | At power |
| Salem 1 | PJM | NJ | 100.0% | 1,146 | — | At power |
| Salem 2 | PJM | NJ | 100.0% | 1,142 | — | At power |
| Limerick 2 | PJM | PA | 100.0% | 1,122 | — | At power |
| Limerick 1 | PJM | PA | 100.0% | 1,120 | — | At power |
| Beaver Valley 1 | PJM | PA | 100.0% | 907 | — | At power |
| Beaver Valley 2 | PJM | PA | 100.0% | 901 | — | At power |
| Calvert Cliffs 1 | PJM | MD | 100.0% | 884 | — | At power |
| Calvert Cliffs 2 | PJM | MD | 100.0% | 861 | — | At power |
| Region II · Southeast (5 units, 4,021 MW online) | ||||||
| North Anna 2 | PJM | VA | 0.0% | 943 | 943 | Outage |
| Grand Gulf 1 | MISO | MS | 100.0% | 1,397 | — | At power |
| North Anna 1 | PJM | VA | 100.0% | 948 | — | At power |
| Surry 1 | PJM | VA | 100.0% | 838 | — | At power |
| Surry 2 | PJM | VA | 100.0% | 838 | — | At power |
| Region III · Midwest (22 units, 19,900 MW online) | ||||||
| Davis-Besse | PJM | OH | 0.0% | 894 | 894 | Outage |
| Clinton | MISO | IL | 83.0% | 1,079 | 183 | Derated |
| Byron 2 | PJM | IL | 95.0% | 1,136 | 57 | Derated |
| Quad Cities 2 | PJM | IL | 95.0% | 911 | 46 | Derated |
| Perry 1 | PJM | OH | 100.0% | 1,240 | — | At power |
| Callaway | MISO | MO | 100.0% | 1,190 | — | At power |
| Braidwood 1 | PJM | IL | 100.0% | 1,183 | — | At power |
| D.C. Cook 2 | PJM | MI | 100.0% | 1,168 | — | At power |
| Byron 1 | PJM | IL | 100.0% | 1,164 | — | At power |
| Braidwood 2 | PJM | IL | 100.0% | 1,152 | — | At power |
| Fermi 2 | MISO | MI | 100.0% | 1,141 | — | At power |
| LaSalle 2 | PJM | IL | 100.0% | 1,134 | — | At power |
| LaSalle 1 | PJM | IL | 100.0% | 1,131 | — | At power |
| D.C. Cook 1 | PJM | MI | 100.0% | 1,009 | — | At power |
| Quad Cities 1 | PJM | IL | 100.0% | 908 | — | At power |
| Dresden 2 | PJM | IL | 100.0% | 902 | — | At power |
| Dresden 3 | PJM | IL | 100.0% | 895 | — | At power |
| Monticello | MISO | MN | 100.0% | 617 | — | At power |
| Point Beach 2 | MISO | WI | 100.0% | 597 | — | At power |
| Point Beach 1 | MISO | WI | 100.0% | 589 | — | At power |
| Prairie Island 1 | MISO | MN | 100.0% | 521 | — | At power |
| Prairie Island 2 | MISO | MN | 100.0% | 519 | — | At power |
| Region IV · West / South-Central (11 units, 11,839 MW online) | ||||||
| Cooper | SPP | NE | 85.0% | 772 | 116 | Derated |
| Waterford 3 | MISO | LA | 97.0% | 1,087 | 33 | Derated |
| Palo Verde 2 | SRP | AZ | 100.0% | 1,314 | — | At power |
| Palo Verde 3 | SRP | AZ | 100.0% | 1,312 | — | At power |
| Palo Verde 1 | SRP | AZ | 100.0% | 1,311 | — | At power |
| Wolf Creek 1 | SPP | KS | 100.0% | 1,177 | — | At power |
| Diablo Canyon 1 | CAISO | CA | 100.0% | 1,122 | — | At power |
| Diablo Canyon 2 | CAISO | CA | 100.0% | 1,118 | — | At power |
| Arkansas Nuclear 2 | MISO | AR | 100.0% | 982 | — | At power |
| River Bend 1 | MISO | LA | 100.0% | 968 | — | At power |
| Arkansas Nuclear 1 | MISO | AR | 100.0% | 826 | — | At power |
Ontario (IESO) separate fleet
Ontario detailMW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet
Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.