NukeGryd
Fleet by NRC Region · updated daily

Regions

The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 15, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
16,663 MW
93.3% of 17,850 MW installed
Fleet Availability
93.3%
nuclear generating ÷ installed
Units in Outage
1
at a full outage (0% power)
Units Derated
1
running below 98% power
Region II

Southeast

Atlanta, GA
89.8%
availability
10,486 MW
online of 11,673
1,187 MW
offline
12 units: 10 at power 1 derated 1 in outage
Top markets
Southern 8,080 MW Duke Progress 3,593 MW
Region IV

West / South-Central

Arlington, TX
100.0%
availability
6,177 MW
online of 6,177
0 MW
offline
5 units: 5 at power
Top markets
SRP 3,937 MW CAISO 2,240 MW

Region Summary

RegionCoverageUnitsCapacity OnlineAvailability MW OfflineOffline / DeratedTop markets
Region II Southeast 12 11,673 10,486 89.8% 1,187 1 / 1 SouthernDuke Progress
Region IV West / South-Central 5 6,177 6,177 100.0% 0 / 0 SRPCAISO
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.

Fleet by Region

Every reporting unit, grouped by region, biggest supply loss first
UnitMarketStatePowerCapacityMW offlineStatus
Region II · Southeast (12 units, 10,486 MW online)
Vogtle 2 Southern GA 0.0% 1,152 1,152 Outage
Hatch 2 Southern GA 96.0% 883 35 Derated
Vogtle 1 Southern GA 100.0% 1,150 At power
Vogtle 3 Southern GA 100.0% 1,114 At power
Vogtle 4 Southern GA 100.0% 1,114 At power
Harris 1 Duke Progress NC 100.0% 964 At power
Brunswick 1 Duke Progress NC 100.0% 938 At power
Brunswick 2 Duke Progress NC 100.0% 932 At power
Farley 2 Southern AL 100.0% 896 At power
Farley 1 Southern AL 100.0% 895 At power
Hatch 1 Southern GA 100.0% 876 At power
Robinson 2 Duke Progress SC 100.0% 759 At power
Region IV · West / South-Central (5 units, 6,177 MW online)
Palo Verde 2 SRP AZ 100.0% 1,314 At power
Palo Verde 3 SRP AZ 100.0% 1,312 At power
Palo Verde 1 SRP AZ 100.0% 1,311 At power
Diablo Canyon 1 CAISO CA 100.0% 1,122 At power
Diablo Canyon 2 CAISO CA 100.0% 1,118 At power

Ontario (IESO) separate fleet

Ontario detail
MW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet

Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.