The U.S. nuclear fleet across the NRC's four regulatory regions. As of Sep 15, 2026 · Updated every morning from the NRC Daily Power Reactor Status Report.
Online Now
13,031 MW
86.3% of 15,103 MW installed
Fleet Availability
86.3%
nuclear generating ÷ installed
Units in Outage
2
at a full outage (0% power)
Units Derated
0
running below 98% power
Region I

Northeast

King of Prussia, PA
74.6%
availability
2,485 MW
online of 3,329
844 MW
offline
4 units: 3 at power 1 in outage
Top markets
NYISO 3,329 MW
Region II

Southeast

Atlanta, GA
89.6%
availability
10,546 MW
online of 11,774
1,227 MW
offline
11 units: 10 at power 1 in outage
Top markets
TVA 8,181 MW Duke Progress 3,593 MW

Region Summary

RegionCoverageUnitsCapacity OnlineAvailability MW OfflineOffline / DeratedTop markets
Region I Northeast 4 3,329 2,485 74.6% 844 1 / 0 NYISO
Region II Southeast 11 11,774 10,546 89.6% 1,227 1 / 0 TVADuke Progress
NRC regions are administrative areas of the U.S. Nuclear Regulatory Commission, derived here from each plant's state. Availability = generating MW ÷ installed MW.

Fleet by Region

Every reporting unit, grouped by region, biggest supply loss first
UnitMarketStatePowerCapacityMW offlineStatus
Region I · Northeast (4 units, 2,485 MW online)
FitzPatrick NYISO NY 0.0% 844 844 Outage
Nine Mile Point 2 NYISO NY 100.0% 1,283 At power
Nine Mile Point 1 NYISO NY 100.0% 621 At power
Ginna NYISO NY 100.0% 581 At power
Region II · Southeast (11 units, 10,546 MW online)
Browns Ferry 1 TVA AL 0.0% 1,227 1,227 Outage
Browns Ferry 3 TVA AL 100.0% 1,227 At power
Browns Ferry 2 TVA AL 100.0% 1,208 At power
Sequoyah 1 TVA TN 100.0% 1,148 At power
Sequoyah 2 TVA TN 100.0% 1,126 At power
Watts Bar 1 TVA TN 100.0% 1,123 At power
Watts Bar 2 TVA TN 100.0% 1,122 At power
Harris 1 Duke Progress NC 100.0% 964 At power
Brunswick 1 Duke Progress NC 100.0% 938 At power
Brunswick 2 Duke Progress NC 100.0% 932 At power
Robinson 2 Duke Progress SC 100.0% 759 At power

Ontario (IESO) separate fleet

Ontario detail
MW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet

Ontario is not an NRC region, so it sits outside the table above. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.