What-If · Re-Curve
Scenario Builder
Slip a start, extend a refuel, drop an outage or add a hypothetical trip. The national forward MW-offline curve redraws as you move it.
Stress-test the supply forecast
Move any unit's outage, extend a refuel, or drop in a hypothetical trip and instantly re-curve the national forward MW-offline line. Size the supply impact of the scenarios you are watching.
Unlocks with Pro · $499/mo
Ontario (IESO) separate fleet
Ontario detailMW Offline
3,632 MW
29.9% of the Ontario fleet
Units Offline
4 of 16
Bruce, Darlington, Pickering
Delivering
8,528 MW
of 12,160 MW installed
Resolution
1 hour
vs. once-daily for the U.S. fleet
Ontario is not part of the scenario model yet; live status for reference. Ontario is reported as a separate fleet and is never added into the U.S. national figures above. IESO grid-operator market data (MW delivered), not NRC percent-power.