NukeGryd
The Fleet

Reactor Finder

Every operating U.S. reactor. Search by plant, operator, state or market, each one opens its own record.
Filtered to BPA SRP CAISO MISO Show all markets
19 units
UnitMarketOwnerStMWPower StatusRecordIndividualOverrun
Arkansas Nuclear 1 MISO Entergy AR 826 100.0% At power ██ ██
Arkansas Nuclear 2 MISO Entergy AR 982 100.0% At power ██ ██
Callaway MISO Ameren Missouri MO 1,190 100.0% At power ██ ██
Clinton MISO Constellation Energy IL 1,079 83.0% Derated ██ ██
Columbia Generating Station BPA Energy Northwest WA 1,151 100.0% At power ██ ██
Diablo Canyon 1 CAISO Pacific Gas & Electric CA 1,122 100.0% At power ██ ██
Diablo Canyon 2 CAISO Pacific Gas & Electric CA 1,118 100.0% At power ██ ██
Fermi 2 MISO DTE Energy MI 1,141 100.0% At power ██ ██
Grand Gulf 1 MISO Entergy MS 1,397 100.0% At power ██ ██
Monticello MISO Xcel Energy MN 617 100.0% At power ██ ██
Palo Verde 1 SRP Arizona Public Service AZ 1,311 100.0% At power ██ ██
Palo Verde 2 SRP Arizona Public Service AZ 1,314 100.0% At power ██ ██
Palo Verde 3 SRP Arizona Public Service AZ 1,312 100.0% At power ██ ██
Point Beach 1 MISO NextEra Energy WI 589 100.0% At power ██ ██
Point Beach 2 MISO NextEra Energy WI 597 100.0% At power ██ ██
Prairie Island 1 MISO Xcel Energy MN 521 100.0% At power ██ ██
Prairie Island 2 MISO Xcel Energy MN 519 100.0% At power ██ ██
River Bend 1 MISO Entergy LA 968 100.0% At power ██ ██
Waterford 3 MISO Entergy LA 1,087 97.0% Derated ██ ██
Every one of these units has a record Individual · $165/mo

Capacity factor, forced-outage days, breaker-to-breaker streaks, refuel and startup speed, scored into one number and ranked against units of the same type, for every operating U.S. reactor.

  • Operational Excellence 0-100
  • Projected overrun days
  • Full outage timeline per unit
  • Cohort ranking by reactor type and cycle