NukeGryd
The Fleet

Reactor Finder

Every operating U.S. reactor. Search by plant, operator, state or market, each one opens its own record.
Filtered to ISO-NE MISO FPL Show all markets
20 units
UnitMarketOwnerStMWPower StatusRecordIndividualOverrun
Arkansas Nuclear 1 MISO Entergy AR 826 100.0% At power ██ ██
Arkansas Nuclear 2 MISO Entergy AR 982 100.0% At power ██ ██
Callaway MISO Ameren Missouri MO 1,190 100.0% At power ██ ██
Clinton MISO Constellation Energy IL 1,079 83.0% Derated ██ ██
Fermi 2 MISO DTE Energy MI 1,141 100.0% At power ██ ██
Grand Gulf 1 MISO Entergy MS 1,397 100.0% At power ██ ██
Millstone 2 ISO-NE Dominion Energy CT 863 100.0% At power ██ ██
Millstone 3 ISO-NE Dominion Energy CT 1,243 100.0% At power ██ ██
Monticello MISO Xcel Energy MN 617 100.0% At power ██ ██
Point Beach 1 MISO NextEra Energy WI 589 100.0% At power ██ ██
Point Beach 2 MISO NextEra Energy WI 597 100.0% At power ██ ██
Prairie Island 1 MISO Xcel Energy MN 521 100.0% At power ██ ██
Prairie Island 2 MISO Xcel Energy MN 519 100.0% At power ██ ██
River Bend 1 MISO Entergy LA 968 100.0% At power ██ ██
Saint Lucie 1 FPL NextEra Energy FL 981 100.0% At power ██ ██
Saint Lucie 2 FPL NextEra Energy FL 987 92.0% Derated ██ ██
Seabrook 1 ISO-NE NextEra Energy NH 1,246 100.0% At power ██ ██
Turkey Point 3 FPL NextEra Energy FL 837 100.0% At power ██ ██
Turkey Point 4 FPL NextEra Energy FL 844 100.0% At power ██ ██
Waterford 3 MISO Entergy LA 1,087 97.0% Derated ██ ██
Every one of these units has a record Individual · $165/mo

Capacity factor, forced-outage days, breaker-to-breaker streaks, refuel and startup speed, scored into one number and ranked against units of the same type, for every operating U.S. reactor.

  • Operational Excellence 0-100
  • Projected overrun days
  • Full outage timeline per unit
  • Cohort ranking by reactor type and cycle