NukeGryd
The Fleet

Reactor Finder

Every operating U.S. reactor. Search by plant, operator, state or market, each one opens its own record.
Filtered to SRP BPA CAISO Duke Carolinas Show all markets
13 units
UnitMarketOwnerStMWPower StatusRecordIndividualOverrun
Catawba 1 Duke Carolinas Duke Energy SC 1,160 100.0% At power ██ ██
Catawba 2 Duke Carolinas Duke Energy SC 1,150 100.0% At power ██ ██
Columbia Generating Station BPA Energy Northwest WA 1,151 100.0% At power ██ ██
Diablo Canyon 1 CAISO Pacific Gas & Electric CA 1,122 100.0% At power ██ ██
Diablo Canyon 2 CAISO Pacific Gas & Electric CA 1,118 100.0% At power ██ ██
McGuire 1 Duke Carolinas Duke Energy NC 1,158 0.0% RFO ██ ██
McGuire 2 Duke Carolinas Duke Energy NC 1,158 100.0% At power ██ ██
Oconee 1 Duke Carolinas Duke Energy SC 862 100.0% At power ██ ██
Oconee 2 Duke Carolinas Duke Energy SC 865 100.0% At power ██ ██
Oconee 3 Duke Carolinas Duke Energy SC 873 100.0% At power ██ ██
Palo Verde 1 SRP Arizona Public Service AZ 1,311 100.0% At power ██ ██
Palo Verde 2 SRP Arizona Public Service AZ 1,314 100.0% At power ██ ██
Palo Verde 3 SRP Arizona Public Service AZ 1,312 100.0% At power ██ ██
Every one of these units has a record Individual · $165/mo

Capacity factor, forced-outage days, breaker-to-breaker streaks, refuel and startup speed, scored into one number and ranked against units of the same type, for every operating U.S. reactor.

  • Operational Excellence 0-100
  • Projected overrun days
  • Full outage timeline per unit
  • Cohort ranking by reactor type and cycle